EventContemporary Period (Republic of Egypt)
The Nile Water Dispute over Ethiopia's Grand Renaissance Dam (GERD)
2011–2025 · Republic of Egypt · The Blue Nile (Benishangul-Gumuz, Ethiopia)
Today: Ethiopia
When Ethiopia, upstream on the Nile, built a giant dam, Egypt downstream strongly objected, worried about its water.
More detail
Two sources checked
Why it happened
Egypt depends on the Nile for almost all (about 97%) of the water it uses. Ethiopia, on the other hand, is the country where most of the Nile's water begins, and since a considerable part of its people live without electricity, it wanted to produce electricity with a dam.
What happened
Ethiopia began construction in 2011 and filled the reservoir over several years from 2020. On 9 September 2025 the dam, which cost about 5 billion dollars, was completed, and it is expected to produce more than 5,000 MW of electricity. The leaders of Egypt and Sudan criticized it as 'unilateral action' and did not attend the inauguration.
What came of it
In Ethiopia the dam is seen as a symbol of national development, while in Egypt it is seen as a security threat on which survival depends. The 1959 Egypt-Sudan Nile Waters Agreement and the 2010 agreement of the upstream countries stand in opposition, and there is still no agreement on how to share the water.
Links with other countries
Ethiopia's GERD, Sudan
People in this event
- Abdel Fattah el-Sisi — He strongly opposed the Ethiopian dam.