EventContemporary Period (Republic of Egypt)
Opening of the New Suez Canal
2014–2015 · Republic of Egypt · Suez Canal (the Ismailia section)
Today: Suez Canal, Egypt
A new waterway was cut next to the existing Suez Canal so that ships could travel in both directions at once.
More detail
Two sources checked
Why it happened
Most sections of the Suez Canal were a single lane, so ships had to wait their turn. The el-Sisi government tried to increase traffic, raise canal revenue and boost the people's confidence.
What happened
Work began in August 2014 and, led by the army, the canal opened in about a year, on 6 August 2015. About 35 km were newly dug and 37 km widened, and the cost of about 8 billion dollars was raised through investment certificates bought by the people. The government announced that the transit time for ships fell from about 22 hours to 11 hours.
What came of it
The goal of greatly increasing canal revenue was not immediately achieved because of conditions in world trade. It became the first symbol of the el-Sisi government's policy of putting large national projects to the fore.
People in this event
- Abdel Fattah el-Sisi — As president he pushed forward the building of the new canal.